Wind Power at Devil's Gulch Ranch is a Reality!

Fall of 2005 some of the students from Big Rock Sudbury School came up to see the start of the new 36 KW wind turbine. More then one truck load of concrete per 20 foot deep hole.

pouring footing

 
 

The kids in Devil's Gulch Ranch Summer Camp put the tower together like a gigantic Erector Set.

 

Student tighting bolst on wind turine on town
 

 

The camp kids did a great job painting the prop.

Child painting blades
    boys painting blades
  After a good torque of the bolts a large crane lifted it into place. lifting the tower
    walking to tower
  Our camp director and a consultant climbed the 80' tower and bolted the 10000 pound unit onto the tower. brian starting climb
    raising the nescell
  The 2 ton of prop was lifted into place
     
  and bolted into place. slidding in place
  Our friend Simon helped us with some minor repairs of the prop along with countless other tasks. Starting to rappel
    Painting Blades
  This is the first large wind turbine to be erected in Marin County. When the wind is blowing it produces about 35 KW of power to supplement the power used by the ranch. students walking to tower